# Risk register

“What could go wrong, and how badly?”

![The risk register in four stages: failure modes found, scored for severity, occurrence and detection, mitigated, and scored again.](https://sosx.ai/figures/analysis-risk-register.svg)

A risk register is one of the most useful documents in a programme and one of the most routinely wasted. It gets written once to satisfy a gate, scored by whoever was available, and then updated by moving a few cells from amber to green before the next review.

## At a glance

What the report carries

-   Executive summary
-   Risk matrix
-   The register itself
-   Pre and post-mitigation view

Ways to run it

-   Quick risk scan
-   Detailed assessment
-   Mitigation planning

Exports to PDF or Word, with an explainability companion and the audit trail alongside it.

## The discipline

The FMEA tradition, which came out of aerospace and automotive for good reasons, insists on three separate judgements rather than one gut feel. How bad is it if this happens. How likely is it. And would we notice before it mattered. That third dimension is the one general-purpose risk matrices drop, and it is often the decisive one: a moderate risk you would catch immediately is a very different proposition from a moderate risk that surfaces at integration.

The other habit worth keeping is scoring twice, before and after the mitigations. A register that only shows post-mitigation scores has hidden the reason the mitigations exist.

## How SOSX runs it

The register is built from the network, so the structural risks are found rather than remembered: critical dependencies, single points of failure and the paths a failure would propagate along are visible in the model before anybody writes them on a list. You can run a quick risk scan for early screening, a detailed assessment, or a mitigation planning pass, across the whole network or focused on one area.

Each risk carries severity, occurrence and detection, and the register is presented both as it stands and as it would stand once the proposed mitigations are in place.

## What you get

An executive summary, the risk matrix, the register itself, and the enhanced pre and post-mitigation view, exportable to PDF or Word. Because the risks are anchored to nodes in the network, a later what-if analysis can show what a proposed change does to the risk profile, which is the version of the conversation a review board actually wants.

## The others in this group

Someone will ask how you know. These are the analyses that answer them.

-   ### SWOT

    “Where are we strong, and where are we exposed?”

    The familiar four quadrants, but built out of the model's loops and confidence levels rather than a workshop's memory.

    ![SWOT in four stages: the loops and confidence levels in the model, sorted into the four quadrants, each item traced to its evidence, and the exposure made plain.](https://sosx.ai/figures/analysis-swot-analysis.svg)

    [More information about SWOT](https://sosx.ai/analysis-tools/swot-analysis/)

-   ### Governance analysis

    “Who decides this, and who has to be told?”

    Decision rights, accountability and escalation paths, as a RACI matrix and the approval chains behind it.

    ![Governance analysis in four stages: the decisions that matter, the RACI assignment, the approval chain behind each one, and the escalation path.](https://sosx.ai/figures/analysis-governance-analysis.svg)

    [More information about Governance analysis](https://sosx.ai/analysis-tools/governance-analysis/)

-   ### Compliance analysis

    “What does the audit trail show, framework by framework?”

    SOSX's own audit evidence for a network, scored control by control against the governance frameworks it aligns with. Alignment, not certification.

    ![Compliance analysis in four stages: the frameworks SOSX aligns with, their controls, SOSX's own audit trail as evidence, and the gaps that remain.](https://sosx.ai/figures/analysis-compliance-analysis.svg)

    [More information about Compliance analysis](https://sosx.ai/analysis-tools/compliance-analysis/)

-   ### Network quality critique

    “How much should we trust this model?”

    Centrality, single points of failure, orphans and coverage gaps, scored, with the fixes ranked by what they buy you.

    ![Network quality critique in four stages: the model as built, its structural weaknesses, its missing data, and a score with the fixes ranked.](https://sosx.ai/figures/analysis-network-quality-critique.svg)

    [More information about Network quality critique](https://sosx.ai/analysis-tools/network-quality-critique/)

Or see [all the analysis tools](https://sosx.ai/analysis-tools/). If you would rather we built the model and ran them for you, that is our [system research, build and analysis](https://sosx.ai/services/research-build-and-analysis/) service.

[Drop us a message and let's have a chat](https://sosx.ai/contact/)